top of page

How to Prepare for a Landscaping or Construction Quote, How to Read Landscaping & Construction Estimates, Construction Project Timelines & Scheduling

Preparing for a Construction or Landscaping Quote

​

Accurate pricing begins with accurate information. The quality of a construction estimate is directly tied to how well project goals, site conditions, and constraints are identified prior to pricing.

​

Define Scope, Goals & Priorities

​

Clients should clearly identify:

​

  • Intended use of the space (aesthetic, functional, structural)

  • Required versus optional scope elements

  • Known problem areas (drainage, settlement, access, aging infrastructure)

​

Undefined scope is the leading cause of pricing revisions and change orders.

​

Documentation & Reference Materials

​

When available, the following should be provided:

​

  • Property surveys and plot plans

  • Site plans, sketches, or architectural drawings

  • Prior permits or inspection records

  • HOA or municipal restrictions (if applicable)

​

Documentation reduces assumptions and improves estimating accuracy.

​

Site Access & Conditions

​

Access limitations directly affect labor, equipment selection, and scheduling:

​

  • Gate widths and overhead clearance

  • Driveway load limits

  • Proximity to neighboring structures

  • Existing landscaping or hardscape to be protected

​

Restricted access often increases manual labor and project duration.

​

Budget & Timeline Awareness

​

While final pricing is determined by scope and conditions, clients should be prepared to discuss:

​

  • Target budget ranges

  • Time-sensitive deadlines

  • Seasonal considerations

​

Early alignment prevents mis-scoped projects and scheduling conflicts. 

​

Understanding Construction Estimates & Proposals

​

Professional construction proposals are structured documents designed to define scope, allocate risk, and establish payment and execution terms — not just pricing.

​

Line-Item Scope of Work

​

Each proposal defines:

​

  • Included work activities

  • Installation methods (where applicable)

  • Material types or performance standards

  • Explicit exclusions

​

If a task is not listed, it is not included.

​

Cost Components

​

Pricing may include:

​

  • Labor based on crew size and duration

  • Materials and handling

  • Equipment mobilization and usage

  • Disposal, hauling, and tipping fees

​

Costs are influenced by site conditions, access, and sequencing.

​

Allowances, Exclusions & Contingencies

​

  • Allowances cover unknown selections or quantities

  • Exclusions define work not included in the agreement

  • Contingencies address unforeseen conditions (soil, utilities, hidden obstructions)

​

These provisions protect both the contractor and the client.

​

Payment Schedules & Milestone Billing

​

Larger projects are typically billed:

​

  • By phase completion

  • By percentage milestones

  • With retainage or final balance due at completion

​

Payment structure reflects project scale, duration, and cash flow requirements. 

bottom of page