A&AC Landscaping​ LLC
2.png)
How to Prepare for a Landscaping or Construction Quote, How to Read Landscaping & Construction Estimates, Construction Project Timelines & Scheduling
Preparing for a Construction or Landscaping Quote
​
Accurate pricing begins with accurate information. The quality of a construction estimate is directly tied to how well project goals, site conditions, and constraints are identified prior to pricing.
​
Define Scope, Goals & Priorities
​
Clients should clearly identify:
​
-
Intended use of the space (aesthetic, functional, structural)
-
Required versus optional scope elements
-
Known problem areas (drainage, settlement, access, aging infrastructure)
​
Undefined scope is the leading cause of pricing revisions and change orders.
​
Documentation & Reference Materials
​
When available, the following should be provided:
​
-
Property surveys and plot plans
-
Site plans, sketches, or architectural drawings
-
Prior permits or inspection records
-
HOA or municipal restrictions (if applicable)
​
Documentation reduces assumptions and improves estimating accuracy.
​
Site Access & Conditions
​
Access limitations directly affect labor, equipment selection, and scheduling:
​
-
Gate widths and overhead clearance
-
Driveway load limits
-
Proximity to neighboring structures
-
Existing landscaping or hardscape to be protected
​
Restricted access often increases manual labor and project duration.
​
Budget & Timeline Awareness
​
While final pricing is determined by scope and conditions, clients should be prepared to discuss:
​
-
Target budget ranges
-
Time-sensitive deadlines
-
Seasonal considerations
​
Early alignment prevents mis-scoped projects and scheduling conflicts.
​
Understanding Construction Estimates & Proposals
​
Professional construction proposals are structured documents designed to define scope, allocate risk, and establish payment and execution terms — not just pricing.
​
Line-Item Scope of Work
​
Each proposal defines:
​
-
Included work activities
-
Installation methods (where applicable)
-
Material types or performance standards
-
Explicit exclusions
​
If a task is not listed, it is not included.
​
Cost Components
​
Pricing may include:
​
-
Labor based on crew size and duration
-
Materials and handling
-
Equipment mobilization and usage
-
Disposal, hauling, and tipping fees
​
Costs are influenced by site conditions, access, and sequencing.
​
Allowances, Exclusions & Contingencies
​
-
Allowances cover unknown selections or quantities
-
Exclusions define work not included in the agreement
-
Contingencies address unforeseen conditions (soil, utilities, hidden obstructions)
​
These provisions protect both the contractor and the client.
​
Payment Schedules & Milestone Billing
​
Larger projects are typically billed:
​
-
By phase completion
-
By percentage milestones
-
With retainage or final balance due at completion
​
Payment structure reflects project scale, duration, and cash flow requirements.